Six areas of work. Most engagements combine several of them — scope is set against
your site list and acceptance criteria rather than a fixed package.
01
Drive test & site survey
Route planning, field collection and post-processing across clusters, corridors and
indoor environments. Collection is carried out to an agreed route and configuration,
with conditions and any deviation from plan recorded as it happens.
Cluster, benchmark, corridor and single-site routes
Scanner and handset-based collection
Indoor walk test and in-building assessment
Logs delivered in your required post-processing format
02
Network optimisation
Parameter review, neighbour and interference analysis, and tuning proposals traced
back to the measurements that justify them. Changes are verified after implementation
rather than assumed to have worked.
Coverage, quality and mobility parameter tuning
Neighbour list and handover relation review
Interference and overshooting investigation
Pre- and post-change verification against the same route
03
RF quality reporting
Single site verification, single site optimisation and acceptance packs assembled
against agreed KPI thresholds and evidence requirements, structured for the review
process they will enter.
Single site verification (SSV) reporting
Single site optimisation (SSO) reporting
Acceptance and handover documentation
Raw logs retained and handed over alongside findings
04
Network planning & troubleshooting
Nominal planning, site candidate assessment and configuration input for new build and
capacity expansion, plus investigation of specific reported problems where the cause
is not yet established.
Coverage and capacity dimensioning
Site candidate assessment and nominal planning
Antenna type, azimuth and tilt recommendations
Targeted investigation of reported degradations
05
NPO & OSS analysis
Counter and KPI trending from operations support systems, correlated with field
measurement so a degradation is attributed to a cause rather than merely described.
KPI trending and threshold breach review
Worst-cell identification and follow-up
Correlation of counter behaviour with field observation
Recurring performance reporting to an agreed cadence
06
Engineering resourcing
Drive test crews, RF tooling and project coordination supplied into your programme,
working under your process, reporting lines and delivery cadence.
Field crews for drive and walk test collection
Post-processing and analyst support
Measurement tooling and licence provision
Project coordination and progress reporting
How an engagement runs
Four steps, agreed before collection starts
Step 01
Scope
Site list, KPI definitions, thresholds and reporting template confirmed in writing.
Step 02
Collect
Field measurement to the agreed route and configuration, with conditions logged.
Step 03
Analyse
Post-processing and correlation against counters to attribute findings to a cause.
Step 04
Report
Findings, recommendations, method and limitations issued with the raw data.
Get in touch
Tell us what needs measuring
Send through your site list, KPI definitions and reporting template and we will come
back with scope, method and timeline.